Catalyst Construction is requesting bids/quotes from subcontractors and suppliers
Catalyst Construction would like to invite your company to bid on the Oaks on Maria project.
ATTENTION: 8(a)/DBE/DVB/MBE/SBE/SDVOSB/
Catalyst Construction is requesting bids/quotes from subcontractors and suppliers for the following project:
PROJECT: Oaks on Maria
LOCATION: Maria Drive Stevens Point, WI 54481
BID DATE: October 8,2024
CONSTRUCTION START DATE: Fall 2024
END DATE: July 2025
OWNER: Three Leaf Partners
PROJECT CONTACT: Kim Laudolff 414-305-0246 [email protected]
PROJECT DESCRIPTION: Slab on grade with wood framed construction with Four levels of residential living. There are ten (10) walk-up townhouses and fifty-six (56) 1 and 2 bedroom apartments. The exterior façade is a mix of fiber cement lap siding, fiber cement panel siding, and brick veneer. Common Areas to have storefront entrances and windows, vinyl windows throughout, and ThermaTru doors are unit walk-ups.
This project is both WHEDA funded project and Green Built Homes.
Emerging Business and minority and women workforce participation is required.
Catalyst Construction
833 E Michigan St # 1000
Milwaukee, WI 53202
Ph: 414-727-6840
“Affirmative Action/Equal Opportunity Employer”